University of Toronto Faculty of Law: Flavelle House
University of Toronto Faculty of Law announced that world renowned architectural firm Hariri Pontarini has been selected for the renovation and expansion plans for the Faculty of Law.
University of Toronto Faculty of Law announced that world renowned architectural firm Hariri Pontarini has been selected for the renovation and expansion plans for the Faculty of Law.
London architectural firm Woods Bagot has developed a proposal for a dramatic mixed-use redevelopment of the Central Saint Martins campus at Southampton Row.
David Chipperfield Architects won an international design competition for the masterplan of a new art and technology quarter in Segovia, Spain.
Following a successful planning application in September 2007, work has recently started on site for a new office/ and research and development centre for leading telecoms company Ericsson on a prominent site at the international Ansty Business Park in the West Midlands, designed by architects Allies and Morrison
Helin + Siitonen Architects, Helsinki buildings: Finland architecture studio – projects by this Finnish architect office include Nokia Headquarters, Espoo & Parliament Extension, Töölö
The Bloomframe® building consists out of 43 apartments, offices and shops. Each compact apartment is equipped with a Bloomframe® balcony to create outdoor space. By transforming the facade into an accessible floor several square meters are added to the apartment.
World renowned architect of The Ascent at Roebling Bridge, Daniel Libeskind, will join Developer William P. Butler and Governor of Kentucky Steve Bashear at the upcoming Grand Opening Ceremony at The Ascent at Roebling’s Bridge.
The Eiffel tower in Paris suffers from its success. Since its creation the amount of visitors coming to reach its top has increased to reach its limit capacity.
On March 26, 1888, the first floor level was finished, 57.63 metres above the Champ de Mars. The sixteen hydraulic jacks with a power of 800 tonnes each were then removed after the first platform was set exactly level.
Located on a steep hillside in the Italian Dolomites, this newly-built hotel was developed as a free-flowing topography–indexed and organized by a series of timber strips–and the serial sequence of apartment units perpendicular to it.
Almere Shop Building, Holland, Architect, Netherlands Retail Design, Picture, Project, News Almere Retail Architecture Dutch Retail Development in The Netherlands – design by Geen Punt Architecten 19 Mar 2008 Almere Shop Beating heart of the residential area Date built: 2008 Design: Geen Punt Architecten The centre of a residential area in Almere (NL) contains a … Read more
Due to the high demand for office space within the new masterplan that contains the Civil Courts of Justice, public space within the development has shifted from being a potential destination to becoming residual, fragmented and dispersed.
The Crystalline Container is an austere transparent parallelepiped protecting and revealing a strong dynamic space holding the many activities of the museum.
To react on the spatial situation of the Siewerdtstrasse a design strategy was developed that adapts the building mass and the apartment types to the different spatial conditions. In contrast to the northern side of the building, which represents a classical frontage, the southern façade is stepped and modulated, structuring the courtyard.
About 3.35 Mio CHF are available for upgrading the railway station Hardbrücke. Selective measures are used to strengthen the identity of the railway station, facilitate the orientation and upgrade the areaway.
The public records office is the collective memory of the political, economic and cultural life of a canton. This makes the questions of an adequate urban location and appropriate architectural expression of central importance.
Most holiday houses look identical, i.e. like conventional single-family houses. The topography, character and quality of the location are seldom taken into account in the planning.