HAK / HLF Krems High School Building Photos, Austria Education Design Images
Krems High School Austria
Austrian Sports Hall Development design by Caramel Architekten
21 Jul 2009
HAK / HLF Krems High School – triple sports hall, Austria
Date built: 2007
Design: Caramel Architekten
Krems High School
Prologue:
the federal school complex, “bundesschulzentrum krems”, which comprises a hotel management school with its own school hotel (“europaschule krems”) and an A- and B-track business high school, was built in the seventies according to the modern functional standards of the time. Due to a serious shortage of space an open, EU-wide, two-stage competition was held in 2001.
The jury recommended dividing the task into two contracts: extension of the classroom wings and construction of the new indoor recess area and extension of the gymnasium. Caramel was awarded the contract to design and construct the indoor recess area and gym extension.
Project Description
The task of converting two lengthwise adjacent, 46-meter long gymnasiums into a fully functional triple gymnasium was to be quite a structural engineering feat. The engineering firm accomplished this using only a 1.8-meter-high prestressed reinforced steel girder that absorbs the loads of both the existing gyms and the newly built extension.
In keeping with the strict budget but also with the intention of clearly articulating the newly built addition as such, a light frame construction method with a high degree of prefabricated components was chosen.
Mere 16-cm-thin reinforced concrete ribs support prefabricated wooden panels; standard synthetic domes arranged in a seemingly random order provide lighting and a view of the outside.
Like a bulge in the ground the gym rises as a hull; no differentiation is made between roof and wall; the two fully glazed narrow sides, in a sense, remain open.
The new indoor recess area extends directly from the gymnasium and is optically connected to this structure by way of its delicate glass-only construction.
HAK / HLF Krems High School – Building Information
hak/hlf krems
indoor recess area and gymnasium extension
architects: Caramel Architekten ZT – Gmbh
Günter Katherl, Martin Haller, Ulrich Aspetsberger
assistant: kolja janiszweski
client: BIG / bundesimmobiliengesellschaft
competition: 2001 – 2-stage
structural engineering: werkraum wien
technical data: gross floor space 2,790 m2
cubage 16,714 m3
start of construction: 01/2006
completion: 09/2007
photos:
[email protected]
A R C H I P I C T U R E +43-732 739437 [email protected]
HAK / HLF Krems High School images / information from Caramel Architekten
Location: Krems, Upper Austria, central Europe
Austrian Building Designs
Austrian Architecture Designs – architectural selection below:
Austrian Architecture Design – chronological list
Vienna Architecture Walking Tours by e-architect
Austria Architect : Studio Listings
Austrian Architecture – Local Selection
Hotel Steigenberger, Krems an der Donau, federal state of Lower Austria
Architects: GERNER GERNER PLUS
photo © Matthias Raiger
Steigenberger Hotel & Spa in Krems
Danube University Krems
Design: Dietmar Feichtinger Architectes
Danube University Krems
Cloudtower, Krems-Land, Lower Austria
Design: the next ENTERprise
Grafenegg Pavilion
KTM Motohall, Mattighofen, Austria
Architects: Atelier Brueckner
photography © Daniel Stauch
KTM Motohall Mattighofen
Swarovski Manufaktur, Wattens, Tyrol
Architects: Snøhetta
photography © David Schreyer
Swarovski Manufaktur in Wattens, Tyrol
Comments / photos for the HAK / HLF Krems High School – Austria Sports Architecture design by Caramel Architekten page welcome